PowerflorUSA, Inc. SYSTEM SPECIFICATIONS
Section 16128-Undercarpet Cabling System Part III - INSTALLATION 3.01 INSTALLATION - A. Qualification
- 1. Floor system and accessories to be installed by the manufacturer's Authorized Installing Dealer to maintain the integrity of the products and acceptable performance of the completed installation.
- B. Inspection
- 1. Examine subfloor for unevenness, irregularities, and dampness that would affect the quality and execution of the work.
- 2. Do not proceed with installation until subfloor surfaces are clean, dry, and clear of other trades and ready to receive flooring system.
- 3. Inspect POWERFLOR components for damage prior to installation.
- C. Preparation and Installation
- 1. The floor system to be prepared and installed in accordance with the floor systems manufacturer's instructions covering preparation, layout, alignment, and installation.
- 2. Installed floor system shall be level within plus or minus 0.125 inches in 10 feet, and plus or minus 0.10 inches over the entire area. Free of rocking panels.
- 3. Provide cutouts, ramps, and closure trim as indicated and as needed. Minimize the number of cut panels. Layout panels to avoid less than 1/2 panel units. Scribe to accurately fit trim pieces.
- D. Adjust and Clean
- 1. Remove floor system installation debris as work progresses, maintaining area under finished floor in a clean condition.
- 2. The general contractor is to protect the finished floor system from damage and misuse.
| | | |